Tradeshow Graphics, Displays, and Exhibits. Lowest Price Guaranteed!     Artwork Guidelines

Custom Hanging Signs Without the Long Lead Times

Custom Hanging Signs Without the Long Lead Times

(No reviews yet) Write a Review

call 866-652-6126

SKU:
Custom Hanging Signs

Custom Hanging Signs Without the Long Lead Times

Did you know that custom hanging signs don't always require long lead times or months of planning?

While complex projects certainly benefit from additional time, many custom hanging signs can be designed, engineered, produced, and shipped much faster than most customers expect.

For most projects, Best Trade Show Display can complete custom hanging sign projects in as little as 12-15 days.

Every Hanging Sign Starts with a Conversation

Every project is different.

Some customers already have artwork and dimensions.

Others simply know they want something that stands out.

Our team works with you to determine:

  • Booth size
  • Venue restrictions
  • Desired shape and dimensions
  • Suspension requirements
  • Branding and graphics
  • Shipping deadlines

 REQUEST A QUOTE → The earlier we're involved, the more options we can provide. 

Nearly Any Shape Is Possible 

Modern fabric hanging signs aren't limited to squares and circles. 

We regularly produce:

  • Square hanging signs
  • Rectangular signs
  • Circular signs
  • Triangle and diamond shapes
  • Ellipses
  • Multi-level structures
  • Completely custom shapes

 REQUEST A QUOTE → If you can imagine it, chances are we can build it. 

Why Hanging Signs Matter

Beyond branding, hanging signs serve an important functional purpose.

They help attendees:

  • Locate a booth from across the exhibit hall.
  • Re-find a booth after walking the show floor.
  • Recognize a brand before reaching the aisle.

 REQUEST A QUOTE →  For larger island exhibits, they're often the first element visitors notice.

 

File Format

As a starting point, we only receive "High Quality Print" PDF files from both PC and Mac software. We recommend exporting files at the "High Quality Printing" setting. Before exporting your file as a PDF, convert all text to outlines and embed all images. Include a screen shot or .jpg proof for content verification.

If you are not able to generate a "High Quality Print" PDF, we accept the following software generated file formats.

  • Photoshop .PSD Include all layers, paths, channels, links and fonts. 
  • Illustrator .AI Convert text to outlines, include all linked images (do not embed images). 
  • InDesign and QuarkXpress files are not recommended for large format printing. We only except "High Quality Printing" PDF's generated from these software programs.

Templates

Artwork templates in PDF format for all graphics sizes can be downloaded on our website.

Resolution

The best results are achieved when the resolution of the images are between 72-125 DPI at final print size (full size). Images submitted at higher than 125 DPI will create larger file sizes without any visible gain in print quality.

Color

All colors must be defined in CMYK. If converted from RGB to CMYK significant color changes can occur, please proof your colors prior to submission. Pantone Spot Colors may be requested, but exact color matches are not always possible. Reference printouts will be considered for layout only, not as actual color reference. If a color layout can not be sent, include a .jpg, .pdf (screen optimized) or screen shot file. Clearly mark filename as"proof". For black use (Process Black).

File Transfer

All files sent by ftp or e-mail should be compressed (.sit, .rar, or .zip). 

Upload Directions:

  • Please place an order before submitting artwork
  • Upload your file. We use Hightail to receive graphics files. Only one file can be added at a time. If you have multiple files please zip them together and upload the zipped file. If you currently have a Hightail account associated with the email you would like to use, you will need to sign into Hightail.com. Otherwise, a username and password is not required.

Click Here to Send Us a Graphics File >

  • Please fill out the form on our Contact page with your contact information, making sure to include your order number
  • Provide a brief description of your order, the graphics file(s) you uploaded, and any other pertinent information

* Please Note: If we do not receive all of this information, we will not be able to determine who the graphics belong to, which will result in a delivery delay. The file types we prefer are a flattened TIFF, or PSD, EPS, and AI files.  Please be patient while your file uploads and wait for it to finish before closing your browser window.

After your order is complete and your file has been uploaded, you will receive a confirmation email from Hightail letting you know your file has been received. Please allow up to 48 hours for a proof to be sent to the email address you provided on the upload form.

Proofing

Proof prints, if required, are approx. 12" x 12”. Please allow for additional production time when proofs are required. Final order delivery will be delayed by the time required to ship and confirm proofs.

After your proof has been delivered, we will wait for your approval before printing your artwork. Please be aware that we will print your graphics exactly as you send them to us. Spelling or grammatical errors are your responsibility. Any adjustment to your graphic can take time and fees may apply if your modifications or adjustments take an hour or more.

Turnaround Time

Turn around time for most 1-5 prints is 3-5 days, plus shipping. Please contact your sales representative for an exact schedule of your order. 

Related Products

Top